A PRACTICAL PLANNING GUIDE

Your kitchen renovation
checklist.

What to agree before ordering, what to prepare before fitting and what to check at the end. A guide from Rory Harrison, kitchen fitter and joiner at RDH.

1. Choose the scope of the job

Decide whether you need someone to fit a kitchen you’re buying yourself, help with design and supply, or a full refurbishment of the room. Write down what you want to keep: appliances, flooring, radiators or the existing sink position can all affect the plan.

Kitchen fitting covers the agreed units, panels, doors and worktops. Removing the old kitchen, plumbing, electrical work, plastering and flooring need their own allowances. A full refurbishment brings those stages into one agreed programme.

2. Check the design before ordering

Review the layout against the actual room. Doors and drawers need space to open, appliance openings must match the selected models, and panels and fillers need to be included in the order. Check the worktop material and the supplier’s measuring and installation arrangements.

  • Keep copies of the layout, elevations and item list.
  • Confirm appliances, sink, tap, handles and finishing panels.
  • Discuss any changes to the positions of the sink, hob and sockets.
  • Check who measures the room and who is responsible for ordering each item.

If you need help with this stage, see kitchen design and supply.

3. Compare the work included in each quote

A low fitting price is hard to compare with a whole-room price. Ask for the work to be listed clearly, including flat-pack assembly if needed, removal and waste, connections, worktops, flooring, plastering and decorating.

Check which products and trades are included, what needs a separate quote and who you pay directly. Agree how additional work will be handled if a hidden problem is found. The kitchen cost estimator helps you explore the scope; a home visit and final product choices are needed for a written quote.

4. Plan deliveries, access and time without a kitchen

Confirm the fitting date before arranging delivery. Make space to store the kitchen safely and allow time to check the delivery for missing or damaged items. Keep the item list and let your supplier and fitter know promptly if anything is missing.

Discuss parking, access through the house, protection of the route and the arrangements for waste. Plan how you will manage while the sink and appliances are out of use. A straightforward fit often takes around one to two weeks; a full refurbishment commonly takes three to four weeks on site, with the actual schedule depending on the room and scope.

5. Allow for room preparation and worktops

The room needs to be ready for fitting. Removal may reveal floors or walls that need extra work, and wet trades need time to dry. Coordinate the plumbing and electrical preparation before the kitchen blocks access to those areas.

Stone worktops normally involve specialist measuring and fitting, often after the units are installed. Confirm the sequence and lead times with the supplier rather than assuming the worktop and connections will be finished on the last cabinet-fitting day. Agree the flooring sequence with the fitter and flooring supplier too; it depends on the product and installation method.

6. Walk through the finished kitchen

Check doors and drawers, handles, panels and the visible worktop finish together. Confirm that the agreed work is complete and record anything still to be resolved. Keep the product care information, supplier warranties and any documents provided by the relevant trades.

At RDH, the aim is to agree the work and price clearly before starting and discuss changes as the job progresses. Meet Rory or send your plans to talk about your project.